New library.

To equip the new library building at the University of Birmingham with shelving, a competitive tendering process by the appointed main contractor, Carillion, called for bids from four suppliers. This was followed firstly by a formal presentation to the University, the Architects and the Contractor and then the provision of sample shelving for evaluation by University staff.

On the basis of both the quality of its product and its extensive experience in equipping university libraries with shelving, Ecospace was selected to supply and install shelving throughout not only the basement but the upper 'open access' floors of the building. To contain the collection to be housed in the lower ground floor area of the new building, it was critical that 50,000 linear metres of shelf space was available. To achieve this meterage, and working in conjuction with the Architects, Associated Architects of Birmingham and personnel from the University, Ecospace produced a final layout using mobile shelving that would accommodate not only octavo, folio and quarto sized books, but a comprehensive audio collection and 46 plan chests, some on mobile bases. Layouts were also produced for both static and mobile shelving in the 'open access' areas of the library on the ground and three upper floors.

A feature of the library shelving system in the 'open access' areas of the library, where nearly 13 linear kilometres of shelf space has been installed, is the use of glass end panels for both static and mobile units. These mobile units, which are situated on the third floor where there is a raised computer floor with a 650mm void under, necessitated the installation of a steel support structure for the tracks to ensure that the weight of the systems was not only carried by the structural concrete deck but maintained the independence of the computer floor itself.

The Installation was completed on budget and on time over an 18 month period in accordance with the programme agreed with the contractor.

Read more: University of Birmingham (pdf)

Other current news articles:

Emily Wilding Davison Building

Ecospace shelving systems installed throughout new library at Royal Holloway, Egham

... read more
... read more about: Emily Wilding Davison Building

FOREG® Office

Mobile shelving with additional benefits.

... read more
... read more about: FOREG® Office

University of Birmingham

New library.

... read more
... read more about: University of Birmingham

WESTON LIBRARY

A new home for Oxford's books

... read more
... read more about: WESTON LIBRARY
back to top